30+ pilot projects worldwide

We have implemented more than 30 successful pilot projects with renowned partners worldwide – our solar solutions have already been installed on a total area of more than 2,000 square metres and include a large number of non-typical applications. 

Our clients

”Buildings that couldn’t previously be used for energy production will be able to cover their own electricity requirements in the future. With Heliatek's technology, they will contribute to a decentralized and green energy supply."
Isabelle Kocher, Ex-CEO, ENGIE

 

„ACCIONA believes that organic photovoltaics have one of the best improvement curves in terms of technological efficiency, so the company has decided to pilot the technology."
Belen Linares, Energy Innovation Director, ACCIONA ENERGY

Our pilot projects

A selection of our most exciting international OPV projects and the most important key figures are listed here.

 

Logo of Looop

Rooftop installation Japan

Completed December 2020

  • 6 m²

    Total area

  • 0.2 kWp

    Total capacity

  • 10

    Total films

  • Matsudo, Japan

    Installation location

Bus Stop Test Site at Ristumeikan University

Completed September 2020

  • 6 m²

    Total area

  • 0.2 kWp

    Total capacity

  • 10

    Total films

  • Kusatsu, Japan

    Installation location

Logo of Etihad Energy Services

Al Jalila Cultural Center Rooftop Test Site

Completed April 2020

Pilot project
  • 25 m²

    Total area

  • 1.0 kWp

    Total capacity

  • 40

    Total films

  • Dubai, UAE

    Installation location

Logo of SOLIVUS

Rooftop Farmhouse

Completed February 2020

Pilot project
  • 38 m²

    Total area

  • 1.4 kWp

    Total capacity

  • 60

    Total films

  • Sevenoaks, UK

    Installation location

Logo of innogy

Concrete Façade Crop Mill

Completed May 2019

Pilot project
  • 221 m²

    Total area

  • 9.6 kWp

    Total capacity

  • 120

    Total films

  • Donauwörth, Germany

    Installation location

Logo of engie

Roland Garros "French Open" Rooftop Food Stand

Completed May 2019

Pilot project
  • 54 m²

    Total area

  • 2.0 kWp

    Total capacity

  • 85

    Total films

  • Paris, France

    Installation location

Logo of Samsung Engineering

Rooftop Building Gangway

Completed April 2019

Pilot project
  • 159 m²

    Total area

  • 6 kWp

    Total capacity

  • 252

    Total films

  • Gyeonggi-do, South Korea

    Installation location

Logo of acciona

Wind Turbine Tower

Completed March 2019

Pilot project
  • 221 m²

    Total area

  • 9.6 kWp

    Total capacity

  • 120

    Total films

  • Breña, Spain

    Installation location

Logo of edp

Truck Trailer on an Eco Summer Festival

Completed March 2019

Pilot project
  • 5 m²

    Total area

  • 0.2 kWp

    Total capacity

  • 8

    Total films

  • Unterschiedliche Standorte, Portugal

    Installation location

Logo of I-SUN Solar Energy Solutions

Sidewalk Canopy

Completed September 2018

Pilot project
  • 39 m²

    Total area

  • 1.6 kWp

    Total capacity

  • 60

    Total films

  • Istanbul, Turkey

    Installation location

Logo of innogy

Façade Logistic Building Duisport

Completed July 2018

Pilot project
  • 186 m²

    Total area

  • 8.1 kWp

    Total capacity

  • 192

    Total films

  • Duisburg, Germany

    Installation location

Logo of AGC Hoesch

Façade and Glasintegration in PVme Project

Completed June 2018

Pilot project
  • 39 m²

    Total area

  • 1.7 kWp

    Total capacity

  • 66

    Total films

  • Antwerpen, Belgium

    Installation location

Logo of engie

"Harmony" Social Project Playground

Completed May 2018

Pilot project
  • 72 m²

    Total area

  • 3.2 kWp

    Total capacity

  • 111

    Total films

  • Mexiko Stadt, Mexiko

    Installation location

Logo of engie

Rooftop Installation School (World’s Largest OPV System)

Completed November 2017

Pilot project
  • 514 m²

    Total area

  • 22.5 kWp

    Total capacity

  • 378

    Total films

  • La Rochelle, France

    Installation location

Logo of LEW Lechwerke

Façade Industrial Hall

Completed October 2017

Pilot project
  • 58 m²

    Total area

  • 2.7 kWp

    Total capacity

  • 87

    Total films

  • Augsburg, Germany

    Installation location

Logo of Hoesch Bausysteme

Integration Metal Façade

Completed October 2017

Pilot project
  • 26 m²

    Total area

  • 1.1 kWp

    Total capacity

  • 40

    Total films

  • Kreuztal, Germany

    Installation location

Logo of engie

Façade Installation R&D Building

Completed June 2017

Pilot project
  • 53 m²

    Total area

  • 2.3 kWp

    Total capacity

  • 83

    Total films

  • Linkebeek, Belgium

    Installation location

Logo of vTrium Energy

Building Rooftop

Completed September 2016

Pilot project
  • 56 m²

    Total area

  • 2.3 kWp

    Total capacity

  • 87

    Total films

  • Singapore

    Installation location

Logo of innogy

Façade Biogas Plant

Completed June 2016

Pilot project
  • 116 m²

    Total area

  • 5.4 kWp

    Total capacity

  • 180

    Total films

  • Bergheim-Pfaffendorf, Germany

    Installation location

Logo of Kandil Steel

Steel Façade Integration Logistic Building

Completed June 2016

Pilot project
  • 13 m²

    Total area

  • 0.6 kWp

    Total capacity

  • 16

    Total films

  • Kairo, Egypt

    Installation location

Logo of vTrium Energy

Glass Integration Building

Completed April 2016

Pilot project
  • 44 m²

    Total area

  • 1.9 kWp

    Total capacity

  • 64

    Total films

  • Singapore

    Installation location

Logo of vTrium Energy

Seletar Walkway Canopy

Completed September 2015

Pilot project
  • 31 m²

    Total area

  • 1.3 kWp

    Total capacity

  • 61

    Total films

  • Singapore

    Installation location

Logo of Reckli

Integration into Concrete Façade

Completed May 2015

Pilot project
  • 30 m²

    Total area

  • 1.0 kWp

    Total capacity

  • 84

    Total films

  • Herne, Germany

    Installation location

Logo of Paranet

Air Inflated Hall

Completed November 2014

Pilot project
  • 39 m²

    Total area

  • 1.5 kWp

    Total capacity

  • 60

    Total films

  • Berlin, Germany

    Installation location

Logo of Reckli

Customized Building Integration

Completed November 2014

Pilot project
  • 18 m²

    Total area

  • 0.6 kWp

    Total capacity

  • 100

    Total films

  • Shanghai, China

    Installation location